Monday, March 14, 2011

"project park" challenge for HMQG

good afternoon and a uuuuggggghhhhhh-happy monday to you! i'm dragging a bit with the time change - are you? the last 9 1/2 weeks have been lacking in the good sleep department after surgery, so taking away an hour of tossing around in bed didn't help me much.

for example: this morning, i showed for PT at my 8am timeslot. the receptionist looks at me and informs me that i'm not on the schedule. i am... but not for another 2 hours... my 8am appointment was for work and our monday morning meeting! oops.

oh! and happy PI day to you! i think i'm going to grab an apple pie on my way home tonight and have 3.14th of it for myself. :)



'

there are a few readers out there who know all about the picture above. it's something i've been excited about since october when we picked out the fabric line and it's finally ready to rock and roll.

HMQG is doing their own charm pack challenge. we chose kate spain's "central park" line from moda for our charm pack and some of us named it "project park." our rules allow us one charm pack and a 1/2 yard of additional fabric to be used on the main project of our choice. if you make a quilt, you are allowed more fabric for backing and binding, but nothing more than the charm pack and up to the 1/2 yard. if you make a tote bag - same thing, but you're allowed more for the lining since it's not the main portion of the project. there are about a dozen and a half of us participating and i can't wait to see what everyone is going to make. we received our charm packs a couple weeks ago and we have until the april meeting to complete the project. woohoo! now...i just have to get started on whatever it is that i'm making!

this weekend, i managed to baste the baby quilt with [K]'s help. i set up my extension table, picked out a lovely warm pink thread and attached the walking foot. this is going to be my first real quilt with the walking foot... as of last night, i had two lines stitched. and then i was too tired. so much for being faster than handquilting and free-motion, right?

check back soon - there should be updates on project park after this saturday's HMQG meeting in our brand new home!

Thursday, March 10, 2011

sewing and a season

i'm starting to get back into the swing of things. in ways, literally! the shoulder still can't move in all directions and we're working on that. 9 weeks today and counting. but i've cooked dinner a few times - all simple and easy dishes and i started sewing again this week!! hooray me!!

don't get me wrong, i LOVE all the family history i've put together over the last month. i'm still utterly obsessed with finding people and get really irriated when i know they exist, but can't find documentation on their parents or siblings. argh. there have been some interesting finds as well. some i knew nothing of, some my parents knew a little of, but didn't mention before, etc. like i have a missing limb on my tree. and i'm told that one of my ex-husband's distant cousins was married to gen. sam houston, so when i get to that point on my son's tree, that will be exciting! and i've traced some lines of my family back to 1650 or so. that's not easy when they're all in germany and i'm here, but thanks to one of my dad's cousins for his side and a book on my mom's side, i've connected some of them back to us.

ok, ok... here's the sewing. i mentioned it already... first up, is {k}'s baby quilt. i started it before surgery and had everything pinned and set up. i had a modern quilt envisioned even though this was not it. but when i found out i had to have surgery and be out of commission for a couple months, i quickly threw it together. my niece was born a week and a half ago, so now it's time for me to get off my butt and move in as high a gear as i can.

i put the borders on last week and wasn't thrilled. the story blocks didn't line up how i wanted and i didn't catch that before surgery. wish i had. but i'm not ripping out the seams, so it's just going to stay this way. {k} will get a better quilt later in life. once the yellow borders were on, i still wasn't excited over it. maybe it's the disappointment of not sewing anything and then i made something too fast without a plan? so i took some suggestions and added a darker bottom border.

k's baby quilt with new stripe


i did trim the bottom yellow a little and it's hard to tell in this picture. snappy said i should use the green so it would look like grass. so i did. and it's ok...ho-hum... still not what i pictured when i bought the adorable fabrics. but...this is it and i'm sticking with it. hopefully they'll wear it out quickly so i have an excuse to replace it with something better.

next up: "bee pieceful" block for february.

'feb

this is the first start-to-finish project i've done in 2 months. took me a couple days to put it together so i could rest the shoulder. it's ok as well... i'd like it better if i hadn't seen so many of the other gorgeous blocks kathy has already received from her other bee and this one. i have a very hard time using my rotary cutter and couldn't do too much. but hey, it is my first actual project since surgery!! we all have to start somewhere again, right? and this is mine.

on to the season - lent! yesterday was ash wednesday. this is the first year snappy has really been associated with the lutheran church and i'm still very proud of him. it's also the first year boo has taken a huge interest in church, our lutheran heritage and faith. boo was so excited he wouldn't wash the ashes off his head when he went to bed. he was disappointed they rubbed off during the night.

snappy decided he's going to be traditional and give something up. his choice: sodas and french fries. a fantastic decision since those are some of his vices. my choice: fabric purchasing. i'm going on my fabric diet now that i'm getting back into sewing and there are so many beautiful temptations out there. i need to use what i have and not buy anything unless i run out of something during a project and need more of it. one thing that i am going to do over the next 40 days is make more with prayers involved... i've wanted to make prayer shawls and have yarn for it already. now is the perfect time, plus, my shoulder doesn't have to move nearly as much as sewing requires. my church doesn't have a prayer shawl ministry, but my mom's does. my church is extremely active in making quilts for everything possible and sending them out to areas in need. both are noble and wonderful ministries and i'm going to give back in both.

Tuesday, March 1, 2011

progress report

last night, i gathered up the wonky star blocks from the HMQG and laid them out to see how it looked.

HMQG wonky star QOV

looks like matisse gave it her stamp of approval... so i grabbed a box of pins and the hubby and we started pinning the blocks into rows. that alone wore my shoulder out. but there's a start to finishing this QOV top and i have a plan for the backing with all the great wonky star blocks that have colored backgrounds. that will take some time too. and cutting. i can't quite use a rotary cutter just yet.

after that, i sat down and stitched 4 seams on my new niece's baby quilt. it's been pinned into rows since 2 days before surgery. there are 2 rows of 3 blocks now with a sashing strip cut out and still waiting... i also have to press seams. hmm. ironing... um... while the shoulder wasn't quite up to the super simple sewing yet, i like to think that maybe picking up the quilt helped my SIL along. she went into labor this morning!

OOOOHHHH!!!! i just got a text message from hubby that baby {k} was born about 2 hours ago and he got a picture. the picture didn't come through on my phone though. argh. ok. he said he didn't get the picture on his phone either, so i feel better, but i NEED a picture! i have a niece in families of boys!